A 38 km widening of the coastal road between Dammam and Al-Khobar, rebuilt with recycled asphalt and lit with low-energy LED.
The brief
Traffic had outgrown the old road, and the works had to keep both directions open through the summer peak.
Our approach
We milled and reused the old surface as the base of the new lanes, phased the works by night, and replaced every streetlight with dimmable LED on a central control system.
Results
- 45% recycled aggregate in the new pavement
- 60% less energy for street lighting
- Both directions open throughout the works


